I have a general question about how MacroScheduler handles scheduled jobs. If I have two jobs scheduled for the same time, will they both get run? Will this happen simultaneously or will one run and then the other?
Thanks,
Josh
Run When Conflicts
Moderators: Dorian (MJT support), JRL
I can't really answer your question 'cause I've never tried it. However, have you read THIS? As a generality, it is not a good idea to run two scripts simultaneously. In the situation where I want two or more scripts to run sequentially, with a minimum delay between them, I create and schedule one script that consists of one Macro> command after another. The Macro> command runs the scripts I want. The second script won't start until the first script finishes. I usually include a short wait between them because it makes me feel good.
Code: Select all
Macro>First script.scp
Wait>1
Macro>Second script.scp
Wait>1
Macro>Third script.scp